Notice of termination · Refurbishment

Ending a tenancy for substantial refurbishment.

This ground needs more paperwork than any other: up to three documents with the notice, one of them from a construction professional. For tenancies from 1 March 2026 it is also tied to the end of a 6-year period.

The short answer

You can end a tenancy when substantial works require the dwelling to be vacated. The notice needs a statement of the works and a certificate that living there would be unsafe for at least 3 weeks. For tenancies from 1 March 2026, only a small landlord can use it, at the end of a 6-year period, with a sworn declaration.

Document legally reviewed by an Irish solicitor: October 2026 · This page checked against the Act by an independent reviewer · Law as at 14 September 2026

Sample notice of termination: page 1, with made-up names
A real sample, with made-up names

NoticeSure is a drafting tool, not a law firm, and does not give legal advice. You prepare your own document from your own answers. Not affiliated with the Residential Tenancies Board.

Who can use it, and when

You must intend to substantially refurbish or renovate the dwelling in a way that requires it to be vacated, and any planning permission the works need must already have been obtained s.34, Table, para. 5.

For a tenancy from 1 March 2026, “at the end of a 6-year period” means you serve the notice before the period ends, with a notice period that expires on or after the end of the period s.35B(5). Take the sixth anniversary of the start, or a later day, as the termination date. The earliest any of these periods ends is 1 March 2032.

Tenancy beganSmall landlordMore than 3 tenancies, or a company
Before 11 June 2022Yes, at any timeYes, at any time
11 June 2022 to 28 February 2026Yes, at any timeYes, at any time
On or after 1 March 2026Only at the end of a 6-year period s.35B(3)(b), (5)No s.35B(2)

What goes with the notice

Each document below must be served with the notice s.34(a)(ii)–(iii). One that follows later does not count, and the notice falls with it.

The RTB’s guide names a registered architect, quantity surveyor or building surveyor for the certificate, and accepts a chartered engineer only where the tenancy began on or after 1 March 2026. Get the certificate before you fix the date of service.

DocumentWhat it saysWhen needed
Statement s.35(9)The nature of the works. Either a copy of the planning permission or, if none is needed, the contractor’s name (if any) and the dates and expected duration of the works. Your commitment to offer the tenancy back once the works are finished.Always
Certificate s.34(a)(iii)In writing, from a registered construction professional: the works would pose a risk to the occupants’ health or safety, should not go ahead while the dwelling is occupied, and the risk is likely to last for a stated period of at least 3 weeks.Always
Statutory declaration s.35(10A)You are not a company, you have 3 tenancies or fewer on the day of service, and the termination date falls on or after the end of the 6-year period. Sworn in person before a commissioner for oaths, a practising solicitor, a notary public or a peace commissioner.Tenancies from 1 March 2026

Notice period and the RTB

Use the period for the length of the tenancy on the day the tenant receives the notice s.66, Table 1: from 152 days (6 months to under a year) to 224 days (8 years or more). For a tenancy from 1 March 2026 ending at its first 6-year mark, that is 180 days; at the end of a second period, 224 days.

Send the RTB a copy within 7 days of service, ideally the same day through the RTB Service Centre. Without it, the notice is invalid s.62(1A). The tenant has 90 days from receipt to refer a dispute s.62(1)(g); s.80.

When the works are finished

Once the dwelling is available for reletting because the works are complete, offer it to the former tenant first, in writing, with a reasonable time to accept of no more than 7 days s.34, Table, para. 5(b); s.35(6). Unlike sale and change of use, there is no time limit: the duty applies whenever the works end, unless the tenancy was validly ended on another ground.

Refurbishment does not, by itself, lift the rent cap for the next tenancy s.19(5)(a)(iii). Works that amount to a substantial change in the nature of the accommodation, as the Act defines it, are treated separately s.19(5)(b), (5A): see market rent resets.

Common mistakes

  • Serving without the certificate, or with one that states no period of risk, or less than 3 weeks.
  • Relying on works that could be done with the tenant in place.
  • Serving before the planning permission the works need has been granted.
  • On a tenancy from 1 March 2026: a termination date inside the 6-year period, or a notice served after the period has ended.
  • Using a chartered engineer’s certificate on a tenancy that began before 1 March 2026, which the RTB’s guide does not accept.
  • Reletting after the works without first offering the tenancy to the former tenant.

The full rules, with the law behind each one: Statutory declarations for a notice of termination.

Sources

What you get for €24.90

  • The notice of termination, built from your answers, with every statement section 62 requires
  • The statement or statutory declaration (or both) your ground requires, ready to sign or swear; a refurbishment certificate must come from your construction professional
  • A clean copy to sign and serve, with nothing else on it (no NoticeSure name anywhere)
  • A sending sheet: how to serve it, the RTB copy (within 7 days, best the same day) and every date
  • Your answers checked against the 2026 rules before you pay, with the section of the Act behind each point
  • Email reminders if you ask for them, and a calendar file (.ics), for the dates that follow
  • Download again for 12 months, on any device, with your purchase code

One payment, no subscription. You see the dates and whether your step is allowed before you pay. If a document cannot be produced because of a fault on our side, we fix it or refund you.

How it compares
Blank templateNoticeSureSolicitor
CostFree€24.90, one paymentProfessional fees
Tells you if your ground or step is allowed (2026 rules)You check yourselfChecked against your answers, before you payYes
Notice period and datesYou count yourselfWorked out, with safety daysYes
Sending sheet with every deadline, and remindersNoYesDepends
Copy ready to sign and serveYou fill it inFilled in from your answers; you read and sign itYes
Advice on your own situationNoNo: a drafting toolYes

Questions landlords ask

Can I end a tenancy that began in 2026 now, to renovate?

Not during the 6-year period. For a tenancy that began on or after 1 March 2026, refurbishment can only end it at the end of a 6-year period, by a small landlord, with a notice served before that period ends (s.35B(3), (5)).

Do I need planning permission?

Only if the works require it. If they do, it must be obtained before you serve, and a copy goes with the statement. If they do not, the statement names the contractor, if any, and gives the dates and expected duration of the works (s.35(9)).

Who can sign the certificate?

A registered construction professional. The RTB’s guide names a registered architect, quantity surveyor or building surveyor, and a chartered engineer for tenancies that began on or after 1 March 2026.

Must I offer the tenancy back after the works?

Yes, when the dwelling becomes available for reletting because the works are complete, unless the tenancy was validly ended on another ground. The offer is in writing and gives the former tenant up to 7 days to accept.

The full rules, with the law behind each one: Statutory declarations for a notice of termination.

Related documents